Electrifying the Island
At the time of Confederation in 1949 slightly over half of the province's population
used electricity. The existing generating stations were not capable of greatly increasing
their capacity. Smallwood promised the electrification of rural areas, and it was necessary
to increase the number of generating stations. Areas were served either by utility
companies or, in the case of Grand Falls and Corner Brook, by the pulp and paper companies.
To extend electrification to rural areas the government created the Newfoundland Power
Commission in 1954. Between 1954-1972 almost every Newfoundlander on the island was receiving
electricity.
In the 1949 election campaign Smallwood promised voters his government would develop local
hydro resources as "cheap power is the foundation of any industry. Grand Falls and Corner Brook would never have amounted to anything without lots of cheap power. Newfoundland has been blessed with great water power. Most of it is running to waste." (Evening Telegram, 16 May 1949) Upon
becoming premier Smallwood continued his focus on hydro, using the lure of cheap power to woo
industrialists. From 1950 to 1953 Alfred Valdmanis, Newfoundland's Director-General of Economic
Development, attempted to attract German technical expertise and capital to Newfoundland to develop
hydro potential on the Bay d'Espoir and Grand Le Pierre rivers. Smallwood wanted to build two new
pulp and paper mills, one in Bay d'Espoir, the other in Labrador and needed the timber and cheap
power from the Hamilton River to make the project economically feasible.
Alfred Valdmanis, n.d.
Valdmanis was Newfoundland's
Director-General of Economic Development from 1950 to 1953.
Courtesy of the Centre for Newfoundland Studies Archives (J.R. Smallwood
Collection 075, Photo 5.05.081), Memorial University of Newfoundland Library, St. John's, NF.
(29 kb)
|
 |
In 1952 Smallwood, Valdmanis and Attorney General Leslie Curtis flew to London and announced
that Newfoundland and Labrador were open to development, especially their hydro resources. At
the culmination of the trip, Smallwood met with businessmen who were to later form the
British-Newfoundland Company (Brinco). Newfoundland Light and Power was also interested in developing
Bay d'Espoir in the early 1960s, and power was needed to meet the anticipated needs of a proposed
aluminum plant on the south coast.
Having reorganized the Power Commission, the province undertook its first major publicly-owned
hydro-electric project in the mid-1960s at Bay d'Espoir. The project was built to provide low-cost
power which would help extend the island's utility services and provide an incentive to attract new
industries. The Power Commission also planned an island-wide transmission grid to connect all
generating and distribution facilities.
The government's "cheap power" policy only attracted one new company, Electric Reduction Company of
Canada (ERCO), producing elemental phosphorus, to Newfoundland, though cheap power was also promised
to the two pulp and paper companies, whose own power stations were unable to meet their needs. In
addition, ERCO also took advantage of federal and provincial subsidies to locate in Newfoundland.
Justifying the power subsidy, the Newfoundland government stated that, overall, the government
would receive more in taxes and other benefits than it paid in subsidies. Budget speeches in 1969
and 1970 anticipated that from 1967 to 1986 seven new industries would benefit from the cheap power
subsidies - an oil refinery and pulp and paper mill at Come by Chance, a linerboard mill, saw mill
and hockey stick plant in Stephenville, a forest products plant at Hawkes Bay and the elemental
phosphorus plant at Long Harbour - and would net the treasury over $180 million. Only the linerboard
mill and the oil refinery became operational for more than a year, the refinery with a checkered
history; and only the linerboard mill can properly be described as having been attracted to the
province by the government's "cheap power" program.
Under its power subsidy, ERCO received power at 2.5 mills per kWh, roughly half the cost at the
time, for a period of 25 years, in exchange for agreeing to locate on the Avalon Peninsula. The
provincial government also provided a $15 million bond issue to help finance the mill, and the federal
government provided $2 million for the road linking the mill and the local community. The
federal government also provided the wharf and harbour facilities, and an additional $5 million federal
grant through the Area Development Incentives Act. The incentives ultimately helped provide 550 jobs,
but returns from the development were relatively small given the amount of public funding. Raw materials
were largely imported from Florida, and the final product was exported to Britain. From 1968 to 1971
ERCO received over $10 million in electrical subsidies. By 1973-74 the power subsidies to ERCO and the
two pulp and paper companies amounted to $6.5 million per year.
 |
ERCO phosphorus plant, Long Harbour, ca. 1974.
Erco was attracted to Newfoundland because of the government's "cheap power" policy.
Reproduced by permission of Martha (Lake) Sanger ©
1974. From Martha Lake, "The Long Harbour Phosphorus Plant: Pollution of the Physical Environment" (Unpublished paper, Memorial University of
Newfoundland, 1974).
(18 kb)
|
Many authors argue that rarely has a policy of cheap power on its own been enough to attract new
industrial development. As the case of ERCO shows, other financial incentives were needed in addition.
One argument in favour of these large projects is that they create jobs, both directly and indirectly,
and in Newfoundland the lure of jobs is strong. But it is important to look at the nature of the jobs
created by these projects, and at the long-term impact of these jobs on the economy. In hydro development,
most jobs are created in the construction phase of the project and are temporary. Even in the construction
phase the number of jobs is limited, with a significant proportion of them demanding skills not available
locally. Many supervisory and managerial positions have been filled from outside the province, and many
of the more skilled construction positions. Newfoundland workers make up a large portion of the "unskilled"
and "semi-skilled" construction workforce. After construction few long-term jobs emerge as the hydro
industry -- and the refining and oil production industries - are capital and power intensive rather than
labour intensive.
Further hydro-electric generating stations were built in the 1970s and early 1980s to meet the
increasing demand for electricity, including the Hinds Lake project in central Newfoundland which
started construction in 1977, the Upper Salmon River project on the south coast which started
construction in 1979, and the Cat Arm project on the northwest coast started in 1981. In the mid-1970s
Newfoundland Light and Power also constructed an oil-fired electric generating station at Holyrood.
Gas turbines were also put into place in the mid-1980s in Stephenville and St. John's. Another electric
station which has been under debate since the mid-1970s is the development of the Lower Churchill.
Talks about developing the Lower Churchill river continue to date, although a memorandum of understanding
between the Québec and Newfoundland governments for developing the Lower Churchill have recently
collapsed.
© 2001, Michelle McBride